Manufacturing
From approved prototype to full production run
Maceration, filling, packing, quality control: Versaty runs the manufacturing of your perfume through to the finished product.
Overview
What we do for you
Once the formula and packaging are approved, your project moves into production. Versaty coordinates every step: maceration of the juice, bottle filling, packing and quality control, before handing over to logistics. You follow progress with one contact who has known your project since the brief. Our commitment is simple: deliver a product true to what you approved, batch after batch, in line with regulations.
Included
- Large-scale production
- Fragrance maceration
- Filling and packing
- Quality control
- Regulatory compliance
- Coordination with storage and logistics
Why entrust it to Versaty
- 01
A single contact
One contact, one process, full control over your production.
- 02
Large-scale runs
An organisation built to move from prototype to large-scale production.
- 03
Quality control
Every step is checked so the product matches what you approved.
- 04
Compliance
Production follows the regulatory requirements that apply to your product.
The process
Step by step, with you.
One dedicated contact guides you from brief to delivery.
Planning
We confirm quantities, components and the production schedule.
Maceration
The juice rests so the fragrance settles into balance before filling.
Filling and packing
Bottles are filled, closed and boxed to your specifications.
Inspection and handover
Final quality control, then storage or shipping of your finished goods.
FAQ
Frequently asked questions
Can I reorder exactly the same perfume?
Yes. The approved formula and specifications serve as the reference for every reorder, so the product stays consistent from one batch to the next.
Where are your products made?
We walk you through how your project will be produced, step by step, from our first conversations.
What is the minimum production run?
Minimum quantities depend on the bottle, the packaging and the formula. We share them as soon as we have reviewed your brief.
What are the production lead times?
Lead times depend on components and quantities. We set a precise schedule before each run starts.
Related expertise
Let’s begin
Your brand deserves its signature.
Tell us about your project: perfume, cosmetics, candles or a full range. We will get back to you with an initial proposal.
Start your project


